Based upon EE-2 and EE-3 drilling costs and the proposed Fenton Hill Phase II reservoir conditions the break-even cost of producing electricity is 4.4 cents per kWh at the bus bar. This cost is based upon a 9-well, 12-reservoir hot dry rock (HDR) system producing 75 MW(e) for 10 yr with only 20% drawdown, and an assumed annual finance charge of 17%. Only one-third of the total, potentially available heat was utilized; potential reuse of wells as well as thermal stress cracking and augmentation of heat transfer was ignored. Nearly half the bus bar cost is due to drilling expenses, which prompted a review of past costs for wells GT-2, EE-1, EE-2, and EE-3. Based on comparable depth and completion times it is shown that significant cost improvements have been accomplished in the last seven years. Despite these improvements it was assumed for this study that no further advancements in drilling technology would occur, and that even in commercially mature HDR systems, drilling problems would continue nearly unabated.