A Mine Production-scheduling Model and Critical Path Analysis of Mine Development Work for Long-range Mine Planning
Critical Path Planning and Scheduling Applied to Mining Operations
Mathias and Mack
A Mine Production-scheduling Model and Critical Path Analysis of Mine Development Work for Long-range Mine Planning
Pre-split Blasting
An Economic and Technical Evaluation of Magnesium Production Methods (in Three Parts).
Reaction Rate of Uranium Metal with Uranium Tetrafluoride in Molten Fluoride Solutions